Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7、Installation
Step 1: Install meter pillars
a)
Let the communication line pass through the right meter pillar.
b)
Put meter pillars on the base frame. First, use 2 Screw M8*15 and 2 washers; second, use 4 Screw M8*50, 4
washers and 4 nuts to fasten meter pillars. (Don't tighten screws at first)
Step 2: Install the meter
a)
Make sure that communication lines are connected correctly
b)
Put the meter on the meter pillars. Use 6 Screw M8*15 and 6 washers to fasten the meter. (Don't tighten
screws at first)
Communication line
Washer
Nut
- 7 -
Screw M8x50
Screw M8x15
Screw M8x15
Washer

Publicidad

Tabla de contenido
loading

Tabla de contenido