-
Gateway modules (AZDI6MCIFR [C/R] / AZDI6MCxxx [C/R] / AZDI6ZMOxxx [C/R]) in Acuazone e Innobus Pro32 (v.4.4.0
or lower) systems (when configured as a zoning system or mixed system).
Important: To guarantee the optimization of the production temperature of the aerothermal units, these device combinations
ES
do not generate demand to the production control board:
-
Zoning module for Electrical Heating Element (AZDI6MZSRE [C/R]) in Acuazone and Innobus Pro32 systems regardless
EN
of the Main control board configuration.
FR
SW1
Once all the main control boards have been addressed, you must save the configuration of the
IT
installation in the production control board. To do that, press SW1. If you make any changes in the
installation, remember to save the new configuration.
PT
SW2
DE
The microswitch SW2 sets the type of installation to control by the central production control. The operation logic of the
microswitch is as follows:
*Only for Airzone RadianT365 system (AZRA6).
RESET THE PRODUCTION CONTROL BOARD
Press and hold on SW1 until the LED D2 is off to return to factory settings
CONFIGURATION
OPERATION LOGIC CONFIGURATION
Choose the configuration that best suits your needs.
Remember: In order to make changes in the configuration, it is necessary to disconnect previously the power supply of the production
control board.
POWER OF THE PRODUCTION CONTROL BOARD
Before powering the control board, please check the following aspects:
1.
Verify the systems are powered and configured. If there is more that one system connected, they must have different
addresses.
2.
Check that the polarity and the interconnect cabling between main boards and systems is correct. Remember that for
a main control board-main control board intercommunication it is recommended to connect only the A and B
communication poles.
3.
Check the elements are correctly connected to the relays.
Follow carefully the steps. Then, power the control board and check that the status LEDs are properly working.
18
Aerothermal
2 pipes
Meaning
3/4 pipes
RadianT*