SYSTEM DETECTION
Once the operation of the control board is verified, it is time to seek systems associated with it. Press on
the SW1 to start the seeking process. Verify that both the LED D6 and D7 flash.
In case of adding new systems or making any changes, please remember to repeat the process.
SELF-DIAGNOSE
Airzone production control boards have LEDS integrated in order to detect malfunctions.
D1
System start-up time
D2
Microprocessor performance
D3
Transmission of the machine bus data
D4
Reception of the machine bus data
D6
Internal domotic bus transmitting data
D7
Internal domotic bus receiving data
D9
External domotic bus 1 transmitting data
D10
External domotic bus 1 receiving data
D12
External domotic bus 2 transmitting data
D13
External domotic bus 2 receiving data
Relay state LED
Meaning
Power
Solid
Red
Solid
Green
Blinking
Blinking
Red
Blinking
Green
Blinking
Red
Blinking
Green
Blinking
Red
Blinking
Green
Blinking
Red
Blinking
Green
Switches
Green
ES
EN
FR
IT
PT
DE
19