Electrical Connection - Climit GG GMP 6 Manual Del Usuario

Ocultar thumbs Ver también para GG GMP 6:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
– unwind the capillary tubes of the two
thermostats and thermometer by
inserting their sensors inside the
sheath (11), securing the assembly
in position using the capillary tube
retaining spring provided;
– complete assembly by fixing the
cover (10) and the front panel (9) to
the side parts.
NOTE: Remove the "Testing Certifi-
cate" from inside the combustion
chamber and keep together with
28
the instructions manual.
2.7

ELECTRICAL CONNECTION

(fig. 9 )
The boiler is fitted with an electricity
cable, and requires a a single-phase
power supply of 230V - 50Hz throu-
gh the main switch protected by
fuses.
The room thermostat (required for
enhanced room temperature con-
KEY
L
Line
N
Neutral
IG
Main switch
TS Safety stat
TC Boiler stat
SA Green voltage LED
P
C.H. pump
B
Direct Feeding Burner (not supplied)
trol) must be connected to the ter-
minals 4-5 after removing the link.
Connect the burner cable supplied.
NOTE:
Device must be connected to an effi-
cient earthing system. CLIMIT decli-
nes all responsibility for injury cau-
sed to persons due to failure to
earth the boiler.
Always turn off the power supply
before doing any work on the electri-
cal panel.
NOTE: The brown (capped off)
cable has to be exclusively used
in case of permanent feeding
burners (type B1).
B1 Permanent Feeding Burner (not supplied)
TA Room stat
OP Programmer's clock (optional)
NOTE: When a room stat is to be fitted remo-
ve the link between terminal 4 and 5 on the
connector plug.
To connect the programmer's clock (OP),
remove the link between terminals 5 and 8.
Fig. 9

Publicidad

Tabla de contenido
loading

Tabla de contenido