Preparation Before Installation - Daikin FTX20K2V1B Manual De Instalación

Ocultar thumbs Ver también para FTX20K2V1B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74

Preparation before Installation

4.
When connecting to an HA system
(Wired remote controller, Central remote controller, Wireless adaptor, etc.)
1) Remove the metal plate electrical wiring cover.
(Refer to the Removal/attachment methods of metal plate electrical wiring covers.)
2)Attach the connection cord to the S21 connector and pull the harness as shown in the figure.
3)Replace the electrical wiring cover as it was, and pull the harness around, as shown in the figure.
Removal method of metal plate electrical wiring covers
1) Remove the front
grille.
2) Remove the electrical
wiring box (1 screw).
3) Raise the upper part
of the metal plate
electrical wiring
cover, pull the part
frontward, and
remove the 3 tabs.
*The appearance of the box may differ for classes 20, 25, 35.
5
HA connector
(S21)
Pull
Screw
S21 Wire harness
routing for Wireless
LAN Adapter
S21 Wire harness
routing for other
applications
Tab
Lay the HA cord
as shown in
the figure
Pull
Tab
English

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido