OPERATION ______________________________
Preparation
1
R emove all packaging and sticker materials
and dispose of them according to the applica-
ble legal regulations.
2
B efore using the appliance for the first time,
clean all parts which come into contact with
water carefully. (See the "Cleaning and care"
section).
3
C ompletely roll out the power cord from the
cable coil
on the bottom of the base
G
Pass the power cord through the slot on the
base.
4
C lean the kettle well before initial use and dis-
card water of first two boiling cycles.
Operation
1
P ush the lid release button
open the lid
.
B
― The lid
opens automatically.
B
2
F ill the kettle with water.
Notes
Do not place the kettle on the base
7
filling it with water.
Never fill the kettle above the maximum level
7
indicator or below the minimum level indica-
tor.
3
C lose the lid
until it clicks into place.
B
4
P lace the kettle on the base
that it is sitting in an upright and stable posi-
tion.
5
I nsert the plug into the wall socket.
6
P ress down On/Off switch
― On/Off switch
E
process begins.
Note
Lid
should always be closed during the boil-
C
7
ing process; otherwise the kettle will not switch
off automatically.
F
on the kettle to
C
while
F
. Make sure
F
.
E
illuminates and boiling
7
A fter a few minutes, the water will start to boil.
The kettle switches off automatically and the
On/Off switch
― The function indicator goes off.
Note
If you want to stop the heating manually, push
7
the On/Off switch
8
D isconnect the plug from the wall socket.
9
T ake the kettle from the base
by the handle
.
Caution
Do not open the lid
7
splash out. Make sure that no water splashes
onto the base
10Pour the water from the spout
glass you want to use.
Notes
If you want to continue the boiling process, re-
7
peat the procedure from 1 to 10.
Let the kettle cool down between each heating
7
process.
HintsandTips
Use softened or filtered water to prevent lime
7
build-up.
moves upwards.
E
upwards.
E
. Only hold it
F
.
D
as hot water could
B
.
F
to the cup or
A
ENGLISH
15