Descargar Imprimir esta página

CRESTO RESQ RED PRO III Manual De Instrucciones página 10

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 113
2.
Connect an additional carabiner to the device top anchorage
3.
Pull the trailing rope through the friction loop and around the device housing. Insert the trailing rope into the carabiner. Make
sure that the trailing rope is managed so no entangelment occurs.
4.
Connect the rescue rope to the harness attachment point of person 1 and use an additional carabiner between the rescue rope
carabiner to the harness attachment point of person 2.
5.
Remove any slack between the persons and the device.
6.
Hold firmly the trailing rope until the persons load is transferred to the device.
Note! This configuration requires that you have an operator operating the descent next to the equipment. See following chapter for
body mounted configuration.
7. Start the descent by easing the grip around the trailing rope.
2 8 0 K G D E S C E N T W I T H B O D Y M O U N T E D R E D P R O I I I
1 1 . 4 .
See figure 12A and figure 12B.
1.
Attach the rescue rope to the anchor point directly or with the anchor sling EN795 cl B around a sufficient structure.
2.
Connect an additional carabiner to the device top anchorage.
3.
Pull the trailing rope through the friction loop and around the device housing. Insert the trailing rope into the carabiner. Make
sure that the trailing rope is managed so no entangelment occurs.
4.
Connect the device to the harness attachment point of person 1 and use an additional carabiner between the device carabiner
to the harness attachment point of person 2.
5.
Remove any slack between the persons and the device.
6.
Hold firmly the trailing rope until the load is transferred to the device.
Warning! Make sure that any fall arrest systems are disconnected prior to the start of descending as lifting with two persons will
overload and could damaged the equipment.
Figure 11
Figure 12A
Figure 12B
© RESQ RED Pro III
9

Publicidad

loading