5.
5.1
Before starting the installation, check that all the required products are complete and functional.
Check profile cutouts/hardware drill holes/cable bushings in accordance with the relevant enclosed manual.
If the abovementioned recesses do not exist, create them carefully and deburr them.
Thoroughly remove swarf.
ATTENTION
Retract the cable on the secured side of the door. Ensure that there is sufficient space for a cable loop.
Do not bend the cable and protect it against abrasion!
Provide a cable disconnection point in the area of the cable link to make it easier to remove the door.
Max. cable length from the lock to the control unit/junction box is 10 m (length of pre-assembled cable), in
addition, larger cable cross-sections may be required to prevent voltage drops (see fig. 6).
A (mm
Fig. 6: cable lengths
Schüco International KG · Karolinenstraße 1–15 · D33609 Bielefeld
Installation

Preparatory work

Attention electronics: make sure the lock recess is free of swarf and clean!
10
)
2
0.14
15
0.25
19
0.34
22
0.5
28
0.75
36
LA
Length of connecting cable 263034 (in m)
8
6
Extension (in m)
17
19
22
26
27
31
35
42
47
57
Distributor/
Branch
4
2
21
23
29
33
36
41
49
56
68
78
LB
Control unit
10000429979-09.2016-02 | 19
S.B 1956; S.B 1959
LA
LB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S.b 1959

Tabla de contenido