Complete The Finished Wall - KALLISTA P29303 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Finished
1/2"
Wall
(1.3 cm)
5-9/16" D.
(14.1 cm)
Plaster Guard
2-1/4" to 3"
Dome
(5.7 to 7.6 cm)
Rough-In Depth

2. Complete the Finished Wall

NOTICE: Do not apply excessive heat to the valve body when
soldering. This valve contains plastic and rubber components which
can melt if excessive heat is applied.
NOTICE: Use the thick wall installation kit (provided) when
attaching this valve to thick wall material such as tile, plaster,
marble, or similar materials. Use the thin wall installation kit (not
provided) when attaching this valve to thin wall material such as
fiberglass or acrylic. The proper kit will properly secure the valve.
NOTE: Do not adjust the maximum water temperature at this time.
Thick Wall Installation
Provide a 5-9/16" (14.1 cm) diameter hole in the wall material.
The flat front surface of the plaster guard must be flush with the
finished wall.
Complete the finished wall.
NOTICE: Do not remove the plaster guard until instructed to do so.
Kallista
Attachment Hole
Backing Plate
Plaster Guard
Outer Ring
Valve Stem
Dome
Finished
Wall
Backing Plate
Plaster
Guard
2-1/4" (5.7 cm)
Rough-In Depth
5
4" D. (10.2 cm)
1081330-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido