www.gruponovolux.com
INSTALACIÓN - INSTALLATION - INSTALAÇÃO
71
ø 35,5
ø 35,5
ø 32
1
N
M
GRUPO GESTIÓN INTEGRAL NOVOLUX INTERNACIONAL, SL.
C/ Ramón Berenguer, 8 (Polígono Industrial Can Vinyals)
08130 Sta. Perpetua de Mogoda - BARCELONA - España
ESPAÑA- PORTUGAL: Tel +34 902 702 700
FRANCE: Tel 0800 918 906
REST OF THE WORLD: Tel +34 93 516 20 05
Fax +34 933 463 751 / 933 114 546 - info@gruponovolux.com
135
ø 25
ø 32
1
Dopo aver interrato l'ac-
cessorio (M) fi ssare la base al
terreno tramite i dadi (E) con
chiave (D) assicurandosi che
il cavo elettrico (N) sia lungo a
suffi cienza per uscire dalla fi ne-
stra di almeno 200mm
1
After concealing the ac-
D
cessory (M) fi x the base at the
surface through the screw nuts
(E) with the key (D) and make
E
sure that the cable (N) is long
enough to exit the window at
least 200mm
MODALITÀ DI INSTALLAZIONE INTERRATA CON ACCESSORIO "M"
CONCEALED INSTALLATION MODE WITH "M" ACCESSORY
STRUMENTAZIONE
INSTRUMENTATION
3
A
4
B
5
C
CH17
D
CH10
T
R
2
N
Serie POLAR
PLINTO IN CEMENTO DIMENSIONI CONSIGLIATE
400X400X400MM
THE DIMENSION RECOMMENDED OF THE
PLINTH 400X400X400MM
VITERIA
SCREWS
DADI M10
(N.3)
E
DADO M6
S
VITI M6x20
F
(N.3 PER BASE-FOR BASE)
VITI M6x25
G
(N.3 PER CAPPELLO
FOR COVER)
VITI M5x12
(N.2)
H
GRANI M8
(N.6)
L
2
Fissare il palo alla base
avvitando le viti (F) con chiave (C)
2
Fix the pole to the base
screwing the screws (F) with the
key (C)
C
F