ASSEMBLY INSTRUCTIONS
Full scale nuts and bolts
M6 x 45mm Hex Bolt (3)
M6 Nylon
Locknut (4)
Approximate assembly time is 5-10 minutes
Suggested Tools: Wrench and/or Ratchet Set
1. Assemble tow bar to hopper frame using (2) M6x45mm
Hex Bolts and (2) M6 Lock Nuts
2. Assemble strut to hopper frame
3. Assemble hitch plate using (1) M6x35mm Hex Bolt and
(1) M6 Lock Nut. Assemble strut cap to tow bar using (1)
M6x45mm Hex Bolt and (1) M6 Lock Nut.
4. Look inside hopper. Insert R-pin into hole in impeller shaft.
M6x35mm
Hitch
Plate
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position before filling hopper
• Determine appropriate setting for material being used by reading the suggested setting on the material's bag AND/OR by referencing the application chart on
your spreader's control panel (Charts provided are only guidelines. Be sure to read the instructions on the bag/box of the material you're spreading to identify
accurate setting needed)
• Lossen wing nut and slide indicator to desired setting. Tighten wing nut completely.
• To begin spreading, start pulling with tractor (about 3mph pace) and pull the gate control towards you to open gate. Push the gate control back to closed position
to stop spreading.
STORAGE AND MAINTENANCE
• When finished spreading, empty hopper of any remaining material
• Thoroughly wash spreader and allow to dry before storing
Replacement Parts
Qty
Part No.
Description
1
6-9006
Wheel, 10" Solid Rubber (2)
1
6-9007
Axle Cap Driver/Idler
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
M6 x 35mm Hex Bolt (1)
M6 Lock
Nut
M6x45mm
Strut Cap
M6x45mm
Tow Bar
M6x45mm
Hopper
Frame
Strut
Strut
Holes In Leg
"R" Pin (1)
"R" Pin