AUGER INSTALLATION
• Screw auger onto impeller shaft. Screw auger retaining nut into auger hole with M10
socket driver. Tighten completely to secure.
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position (do not hold bail down when filling)
• Determine appropriate setting for material being used by reading the suggested setting on the material's bag.
Be sure to read the instructions on the bag/box of the material you're spreading to identify accurate setting needed)
• To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
• To stop spreading simply let go of the bail and the gate will close
BAFFLE OPERATING INSTRUCTIONS
• Adjust baffle by hand to block distribution accordingly. Front and sides can be adjusted independently.
• Use wing nuts to adjust tension on baffles.
STORAGE AND MAINTENANCE
• When finished spreading empty hopper of any remaining material
• Thoroughly wash spreader and allow to dry before storing
• To fold down handle:
- Simply remove the bottom two bolts on the handle
- Loosen two M6 Hex nuts and fold down handle
- Replace two bottom bolts
- Tighten M6 Hex nuts completely
GRATE
(model 81008A only)
• If salt or spreading material is too large for the grate, remove grate before use.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
(model 81008A only)
(model 81008A only)