Frame Rail
Hitch Shown In Proper Position
Equipment Required: Pull Wires (Provided)
Fastener Kit: 24859F
Wrenches: 11/16"
Drill Bits: None
Frame
Rail
j
Carriage Bolt – 7/16-14 x 1.50 GR5
Qty. (4)
k
Qty. (4)
Block ¼ x 1 x 3
l
Conical Toothed Washer – 7/16"
Qty. (4)
1.
Enlarge the access holes in the vehicle to accept the 1/4 X 1 X 3 block.
2.
Fishwire blocks and carriage bolts through the frame rails into the existing holes in the vehicle.
3.
Raise hitch into position, being careful not to push fasteners into frame, and secure with conical washers and nuts.
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to prevent
entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working beneath a vehicle
and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5 and
SAE J684.
z
2010, 2012 Cequent Performance Products
Installation Instructions
Fascia
Drawbar Kit:
3594
Drawbar must be used in the
Rise position only.
n
m
l
Tighten all 7/16-14 GR5 fasteners with torque wrench to 50 Lb.-Ft. (68 N*M)
Chevrolet Cruze
Do Not Exceed Lower of Towing Vehicle
2000 LB (908 Kg.) Max Gross Trailer Weight
200 LB (90.8 Kg) Max Tongue Weight
Wiring Access Location: PC3, PC4
Access Hole
Frame
Rail
n
k
j
m
l
m
Hex Nut – 7/16-14
Qty. (4)
n
Qty. (4)
Pull Wire
Sheet 1 of 3
Part Numbers:
Manufacturer's Rating or
k
m
l
m
l
24859N
1-9-12
Form F206 Rev A 5605
24859
60275
77232
j
Rev. B