Immediately wipe away any excess sealant, and fill any
voids as needed.
If you applied masking tape around the lavatory edges,
carefully remove it at this time.
Verify that the lavatory has not moved out of position.
Allow the sealant to cure for at least 30 minutes before
proceeding.
Connect the faucet supply lines.
Connect the drain assembly.
Open the faucet valves, and check for leakage.
Clean up with a non-abrasive cleaner.
ABOVE-COUNTER INSTALLATION
Cut out the template along the inside of the template
cutout line labeled "Above-Counter Cut-Out".
Position the template on the countertop.
For Wall-mount faucets: Be sure to provide sufficient
spout overhang into the lavatory basin. See the
roughing-in notes for minimum spout length information.
For Countertop faucets: Pay special attention to the
spout and handle fit clearance when locating the faucet,
as noted below. Use the template to locate the faucet
spout hole centerline on the countertop. This centerline is
recommended to provide adequate clearance between
the edge of the lavatory and the spout.
Check for adequate clearance between the backsplash,
faucet spout and handles, and lavatory. We recommend
clearance of at least 1" (2.5cm) between:
S
the installed lavatory and the faucet spout;
S
the installed lavatory and the end of the faucet
handles;
S
the faucet spout and handles, and the
backsplash.
Refer to the faucet installation instructions for required
clearance, and mark the preferred faucet hole locations.
Trace the template on the countertop.
Kohler Co., Kohler, WI, U.S.A.
Nut
Backsplash
Spout
Centerline
Cut-out
Line
5
Fig. #12
Gasket
Nut
Gasket
Fig. #13
1" (2.5cm)
Minimum
Clearance
Outside
Edge of
Lavatory
Fig. #14
1007278-2-
A