4.
Dress all wires neatly (Figure 4.7).
See the GenReady Installation/Wiring Diagram for connec-
tions.
Figure 4.7 — Completed Charger Connections on
Generator Control Panel
8
Section 4 — GenReady Installation
Battery Charger Installation Guidelines
NOTE:

4.1.4 OPERATIONAL TESTING

1.
If already connected, disconnect the battery in the generator.
Remove the negative cable first followed by the positive cable.
Take care not to short the cables together.
2.
Ensure power is applied to the battery charger input.
3.
Connect a volt meter across the battery leads. The voltage
reading should be between 12.8VDC and 13.8VDC (Figure
4.8.
4.
If the voltage is within range installation of the battery charger
is complete. If the voltage is not within range verify all wiring
and sizing and retest.
5.
Re-connect the battery cables. Positive cable first followed by
the negative cable.
Figure 4.8 — Measurement of Charger Output with
Battery Disconnected