Standard Transfer Switch (Rtsn) Or (Rtse) Service Entrance Rated Transfer Switch Installation; Wiring And Connections At The Transfer Switch - Generac 0055181 Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.
If the voltage is within range installation of the battery charger
is complete. If the voltage is not within range verify all wiring
and sizing and retest.
5.
Re-connect the battery cables. Positive cable first followed by
the negative cable.
3.1
STANDARD TRANSFER SWITCH
(RTSN) OR (RTSE) SERVICE
ENTRANCE RATED TRANSFER
SWITCH INSTALLATION
3.1.1 WIRING AND CONNECTIONS AT THE
TRANSFER SWITCH
Choose the appropriate option.
See the appropriate RTSN or RTSE Installation/Wiring Diagram
in the "Interconnection Diagrams" section for connections.
Option 1 — Protected Load Provided in Load Center
1.
Install a 15A breaker in the load center (Purchased or supplied
separately). The breaker must be on a generator backed-up
circuit or the battery in the generator will not maintain its
charge during extended run periods.
2.
Run the 120VAC hot wire and neutral wires to the generator.
See the appropriate RTSN or RTSE Installation/Wiring Diagram
in the "Interconnection Diagrams" section for connections.
Option 2 — Protected Load Provided in the RTS, Fuse
Block Installation
This section is only appropriate for 2008 RTSN or RTSE transfer
switches.
1.
Mount the optional 5amp 600V fuse and holder in the transfer
switch. (Purchased or supplied separately). Pre-2008 transfer
switches will not have holes pre-drilled for the fuse holder.
In this case, it is necessary to drill holes in the enclosure to
mount the fuse holder (see Figures 3.1 and 3.4).
2.
Connect one side of the fuse to terminal (T1) of the transfer
switch using a spade lug. Pre-2008 transfer switches will
not have the spade lug attached to terminal T1. The spade
terminal is available separately if required (see Figures 3.2
and 3.4).
3.
Run the other side of the fuse holder (120VAC Hot) along with
the neutral from the neutral lug to the generator (see Figures
3.1 and 3.5).
See the appropriate RTSN or RTSE Installation/Wiring Diagram
for connections.
Section 3 — Standard or Service Entrance Transfer Switch Installation
NOTE:
NOTE:
NOTE:
NOTE:
Battery Charger Installation Guidelines
Figure 3.1 — RTSN Fuse Block Installation and Neutral
Connection
Figure 3.2 — RTSN Fuse Block Installation T1
Connection
Figure 3.3 — RTSN Fuse Block Installation When
Completed
3

Publicidad

Capítulos

Tabla de contenido
loading