Accessing the INFO menu from the main page of the REC10 it is possible
to display the TIME FUNC SCREED HEATING value regarding the number
of hours since the start of the function.
Once activated, the function takes priority, if the appliance is shut down by
disconnecting the power supply, when it is restarted the function picks up
from where it was interrupted.
The function can be interrupted before its end by putting the appliance in
a condition other than OFF or else by selecting DEACTIVATE FUNCTION
from the relative menu.
Note: The temperature and increase values can be set to different values
only by qualified personnel, only if strictly necessary. The manufacturer
declines all responsibility if the parameters are incorrectly set.
DAY
TIME
1
2
3
4
5
6
7
5.11 Checks during and after the first commissioning
After starting up, check that the boiler carries out the start-up procedures
and subsequent shut-down properly.
Generate a heating request by intervening on the thermostat which detects
the ambient temperature. Check the domestic hot water operation (if
connect a water tank) by opening a hot water tap.
Check the full stop of the boiler by turning off the system's main switch.
After a couple of minutes of continuous operation the binders and
manufacturing waste evaporate and it will be possible to carry out:
- checking the combustion.
HOT WATER ONLY
HEATING AND HOT WATER
5.12 Gas conversion
It is easy to convert from one gas family to another even after the boiler
has been installed. This operation must be performed by professionally
qualified staff.
The boiler is designed to work with natural gas (G20). To convert the boiler
to LPG (G31) proceed as follows:
- access the technical parameters as explained in the section "4.1 Access
to the technical parameters"
- set the password INSTALLER
- select COMBUSTION MONITORING with the "up" and "down" keys,
confirming the selection
AIR PURGING CYCLE
EXHAUST PROBE RESET
EXHAUST PROBE RESET
ERROR HISTORY
ALARM HISTORY
COMBUSTION MONITORING
COMBUSTION MONITORING
TEMPERATURE
0
20°C
6
22°C
12
24°C
18
26°C
0
28°C
12
30°C
0
32°C
0
35°C
0
35°C
0
30°C
0
25°C
BOILER
BOILER
OFF
OFF
SUMMER
WINTER
TECHNICAL
TECHNICAL
PARAMETERS
PARAMETERS
VENT CYCLE
- select GAS TYPE
- select LPG
COMBUSTION MONITORING
COMBUSTION MONITORING
GAS TYPE
GAS TYPE
BOILER TYPE
BOILER TYPE
COMBUSTION OFFSET
COMBUSTION OFFSET
INSTALLER
The boiler DOES NOT require additional adjustments.
b
The boiler may only be converted by qualified staff.
b
After conversion apply the new rating plate contained in the
documentation envelope.
5.13 Combustion check
To carry out the combustion analysis, proceed as follows:
- power the boiler electrically by setting the main system switch to "ON"
- set the status of the boiler to OFF
- access the technical parameters as explained in the section "4.1 Access
to the technical parameters"
- select COMBUSTION ANALISYS with the "up" and "down" keys,
confirming the selection
INSTALLER
INSTALLER
- select ACTIVATE FUNCTION with the "up" and "down" keys, confirming
the selection.
PWM
blu (-)
3
P
X8
marrone (+)
1
VALVOLA GAS
230 V
OPE
OPE
ausiliario
M4
1
2
3
4
blu
blu
marrone
marrone
1
2
3
4
5
INSTALLER
rosa
INSTALLER
- Note: the combustion analysis function can also be activated by pressing
the SW1 key on the electronic board AKM01 (this requires removing the
5
4
3
2
1
6
plug (C) from the cover of the instrument panel to access the electrical
components).
X1
X1
X15
X4
6
1
2
1
5
F2=4A T
1
6
1
5
1
1
12
X25
X19
X9
S.M. S.R.
T.L.A.
Non
GAS TYPE
GAS TYPE
NATURAL GAS
INSTALLER
TECHNICAL
TECHNICAL
PARAMETERS
PARAMETERS
WEATHER COMPENSATION
THERMOREGULATION
RANGE RATED
RANGE RATED
CALIBRATION
CALIBRATION
COMBUSTION ANALYSIS
SWEEPER
COMBUSTION ANALYSIS
SWEEPER
230 V
V Hv
N L
F= 3.15A F
ACTIVATE FUNCTION
ACTIVATE FUNCTION
M3
F
arancione
combustion analysis button SW1
E.R.
X6
X3
X7
1
3
1
AKM0x
10
3
1
5
1
4
1
1
4
1
X13
X8
X21
X2
X16
T.P.
F.L.
S.S.
3
1
ENGLISH
NG
LPG
LPG
5
4
3
2
1
2
1
X4
X15
SW1
6
1
5
1
6
21
V Lv
3V