2. Open the roof, loosen the forward clamp on the air inlet hose,
and slide the hose away from the hose fitting (8 KVA).
3. Slide the fuel selector pin on the carburetor out towards the
back of the enclosure (8 KVA).
4. Replace the inlet hose and tighten the clamp securely.
5. On 10 and 13 KVA models, simply remove the air cleaner
cover and slide the fuel selector pin outward from the natural
gas to the LP position.
INSTALLING & CONNECTING GAS LINES
1. Both natural gas and LP Vapor are highly volatile substances,
so strict adherence to all safety procedures, codes, standards
and regulations is essential.
Gas line connections should be made by a certified plumber
familiar with local codes. Always use AGA-approved gas pipe
and a quality pipe sealant or joint compound.
Verify the capacity of the natural gas meter or the LP tank in
regards to providing sufficient fuel for both the generator and
other operating appliances.
2. Most applications will require an external manual shutoff valve
on the fuel line.
3. Where the gas line is to enter the generator, install a T-fitting
to allow for gas pressure monitoring. On one opening of the
fitting install a ¼" NPT nipple and threaded plug. In some
cases a sediment trap may also be installed.
General Information
5