Prepare The Site - Kohler K-308 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Prepare the Site

Rough Plumbing
Shut off the main water supply.
Install or relocate the supplies as necessary.
Support Framing
Determine the location of the valve, and install the support
framing.
Kohler Co.
3
088841-2-AC

Publicidad

Tabla de contenido
loading

Tabla de contenido