Commissioning; Technical Data; Contact Allocation Table - Festo EduTrainer Universal Manual Del Usuario

Ocultar thumbs Ver también para EduTrainer Universal:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 19-inch module 8DOUT

7.2 Commissioning

1. Connect the inputs/outputs to the PLC using a flat cable:
SV2: Siemens S7 (16-pin)
SV1: Other controller types (10-pin)
2. If using modules in parallel, these can be connected via the free insulation-displacement connector SV1
or SV2 using flat cables.
3. Connect the 24 V power supply by means of the 3-pin connector SL1 or SL2.
4. The jumper JP1 is used to define whether the output module is supplied directly via 24 V or via 24 V NA.
24 V NA is switched off in the event of an EMERGENCY-STOP
(jumper between pins 1 and 2: supply via 24 V; jumper between pins 2 and 3: supply via 24 V NA).
5. Screw the 19-inch module into the frame.

7.3 Technical data

Operating voltage
Output current
Connection
Front-plate width
Subject to change

7.4 Contact allocation table

Pin
SV1
1
L1+
2
Q0
3
Q1
4
Q2
5
Q3
6
Q4
7
Q5
8
Q6
58
All manuals and user guides at all-guides.com
SV2
Pin
0V
9
Q7
10
0V
11
Q6
12
0V
13
Q4
14
0V
15
Q4
16
24 V DC
Max. 0.5 A per output
4 mm safety sockets
6 modules
SV1
SV2
Q7
L1+
0V
Q3
L1+
Q2
L1+
Q1
L1+
Q0
© Festo Didactic GmbH & Co. KG 739319

Publicidad

Tabla de contenido
loading

Tabla de contenido