Risk of damage to pump or other equipment.
•
Periodically inspect pump and system components. Regularly check piping for weakness or wear, making certain that all connec-
tions are secure.
•
Schedule and perform routine maintenance as required. Refer to
INSTALLATION
Typical Installations
The following drawings illustrate how the system should be arranged in the plumbing system.
Shallow Well with Foot Valve
Priming Plug
Drain Plug
Clean-Out Plug
Suction
Well Seal
Well Casing
Foot Valve
Shallow Well Inline Check Valve
Priming Plug
Drain Plug
Clean-Out Plug
Suction
Well Seal
Well Casing
1-1/4" PVC Elbow
Tank
Relief Valve
Pressure
Gauge
(optional)
Vent Plug
Drain
Vent
Tank
Relief Valve
Pressure Gauge
(optional)
Vent Plug
Drain
Inline Check Valve
Vent
1-1/4"
Galvanized
Pipe
Well
Point
"Maintenance" on page
7.
Shallow Well Inline Tank with Foot Valve
Relief Valve
Priming Plug
Drain Plug
Clean-Out Plug
Suction
Well Seal
Well Casing
Foot Valve
Shallow Well Tank Mounted System, Foot Valve
Shut Off Valve
Union Couping (2 are required)
Priming Plug
Pressure
Gauge
(optional)
Drain Plug
Clean-Out Plug
Drain
INSTALLATION
Typical Installations
Tank
Pressure Gauge (optional)
Vent Plug
Vent
Vent
Plug
Suction
Vent
Well Seal
Well Casing
Relief
Foot Valve
Valve
3