Prepare The Site - Kohler K-1110 Guia De Instalacion

Ocultar thumbs Ver también para K-1110:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bath
1/16"
(2 mm)
Tile
Brick
Approved Tile Backing
Approved Tile Backing
2. Prepare the Site - Concrete Construction
CAUTION: Risk of product damage. Do not support the bath by the rim.
NOTICE: Adequate floor support must be provided. Consult the roughing-in sheet packed with your bath
for specific floor loading requirements.
NOTICE: Provide adequate ventilation and a minimum of 15 cubic feet (.4 cubic meters) in the installed
location for cooling the motor and to supply sufficient air for the blower. Do not install the blower motor
closer than 1" (2.5 cm) from the wall or other objects.
NOTE: This bath may be installed in a drop-in or an island installation. An island installation requires a
four side surround. In both instances, make sure the deck is supported by brick or concrete.
Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and
level.
Provide access panels as required to service the blower motor and control.
Construct brick or concrete supports.
Provide a 1/16" (2 mm) gap between the bath rim and the concrete or brick framing. Frame the
floor, or construct a frame for a raised installation, in accordance with the roughing-in information
packed with the bath.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.
Kohler Co.
Tile
Brick
7
Bath may be installed next
to the wall or as an island
installation.
Typical
access
panel
Install an access panel to allow
the pump to be serviced.
1035472-2-F

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1158K-1375K-1418K-1457K-11343

Tabla de contenido