START-UP PHASE IF-VS ÷ IR-VS
Connect the kneading machine to the electrical mains and turn the main switch A to the position
"1".
Turn the timer knob C to the desired time from 0 to 30 min.
Press the green button B to start both the tank and the spiral.
Turn the speed regulator knob E to increase or decrease the speed of the tank and spiral.
COMMAND PANEL DESCRIPTION IF-2V ÷ IR-2V
The panel is made by a selector (A) to the double speed, by a button 0-1 (B)
The panel allows the switching on and off of the mixer, it regulates the operation and
allows the setting.
Legend:
A = Selector 1-0-2
B = START - STOP
START UP ÷ IR-IF-2V 2V
Connect the mixer to the power supply and turn the selector switch to position "1" or "2"
depending on the desired speed.
Press "1" on the B button to initiate both a bath and a spiral.
A
- 28 -
B