Preliminary Operations - DeLonghi ECO310 Manual Del Usuario

Ocultar thumbs Ver también para ECO310:
Tabla de contenido

Publicidad

PRELIMINARY OPERATIONS

Check after transport
tegrity of the appliance and the presence of all acces-
Installing the appliance
when installing the appliance:
Connecting the appliance
Attention!
corresponds with that indicated on the data plate
Filling the water tank
Attention: do not operate the appliance without
Information:
HOW TO PREPARE ESPRESSO COFFEE
-
Pre-heating the coffee machine
-
perature:
-
-
HOW TO PREPARE THE ESPRESSO USING
GROUND COFFEE
-
Attention:
8
-
-
-
-
-
-

Publicidad

Tabla de contenido
loading

Tabla de contenido