Start Up Instructions - Garland MULE 561 E Manual De Instrucciones

Ocultar thumbs Ver también para MULE 561 E:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

English

6. START UP INSTRUCTIONS

6.1. LIST OF MATERIALS
This machine includes the following elements that you
will find inside the box:
• Engine
• U tube
• Down tube
• Screw M5x25 (x2)
• Nut M5(x2)
• Screw M6x45 (x4)
• Wing nut M6 (x4)
• Clip (x2)
• Cable extension holder (x1)
• On/Off switch screw holders (x2)
• Instruction manual
6.2. MOUNTING
6.2.1. TRANSPORT HANDLE
Attach the transport handle (1) by inserting it on
the bottom tubes of the machine (2) and use the
screws and nuts provided to attach the handle to the
machine.
6.2.2. TOP HANDLE
Place the coupling cable (3) through the top handle.
Use the screws (4) and wing nut (5) to hold top handle
to the transport handle.
Use the two clips (6) to hold the cable.
6.2.3. INSTALLATION OF THE ON/OFF SWITCH
1. Place the switch making it coincide with the two
holes in the top handle and tighten the two switch
holder screws into place.
6.3. CHECKING POINTS PRIOR TO USING THE
MACHINE
The current and tension supplied must coincide
with those in the characteristics label. Prior
to starting work check that the machine works
adequately and all security measures work.
Check the machine and look for any loose pieces
(screws, nuts, housing etc) and for any damages.
Tighten, repair or replace those pieces that you have
found to be in a bad state. Ensure that there are no
leakages. Do not use the machine if damaged or not
well regulated.
28/92

Publicidad

Tabla de contenido
loading

Tabla de contenido