Recommended area for equipment installation
2.1.2 Electrical Installation
The equipment has been designed to operate 110 Volts, 60 Hz. When you receive the
equipment check the voltage indicated on the cord label.
The power plug has 3 pins the middle pin is the ground. All the 3 pins must be properly
connected.
Make sure the network voltage is the same as indicated on the cord label.

2.2 Pre Operation

Before to use the equipment all the parts to be in contact with the product shall be washed
with water and neutral soap (see item 3.4 Cleaning).
Make sure the equipment is stable on the working surface.
The Combs (Pic.02) prevent the product to wound up on the Rolls #.04 (Pic.01) and
therefore help the product to be expelled.
Always use the Combs (Picture 02) to process any product.
550mm