Testing, Transport, Delivery And Installation; Testing; 1- List Of Provided Equipment; Installation - Berkel BS+2020 T Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3 Testing, transport, delivery and installation

3.1

Testing

Your machine has been tested at our factory to ensure correct operation and regu-
lation. During testing, cutting tests are performed on material identical to the mate-
rial cut by the user.
3.2
Delivery and handling
630
tion.........." and the reason. If, once the package has been opened, some of the
machine components are found to be damaged, report the fact to the forwarding
agent within three days from the date specified in the documents.
3.2.1
List of provided equipment
The following equipment is included in the machine packing:
N° 1 use and maintenance manual
3.3

Installation

ATTENTION!
The installation area must be level and firm. The supporting surface must provide a
completely safe base. Plenty of space must be left around the machine - see Fig.
2.4.1. This permit greater manoeuvrability in the work phases and provides access
for subsequent maintenance operation. Suitable lighting must be provided around
the machine to ensure correct operator visibility.
Move the packing with a forklift truck or similar as the machine is packed on
a pallet and protected in a cardboard (Fig. 3.3.1).
Fig.3.2.1
All the equipment delivered di thoroughly
1430
checked before delivery to the forwarding
agent.
reached otherwise with the customer or trans-
port conditions are particularly critical, the
machine will be wrapped in nylon and card-
board on pallet. The dimensions of the pack-
750
ing are shown in Fig. 3.2.1. Upon receipt of
the machine, check that the packing is intact.
If it has been damaged, sign the carrier's
delivery note but add: "I accept, with reserva-
When packed, the machine weights 75 kg.
NOTE
Measures are expressed in millimetres.
Unless
agreements
18
have
been

Publicidad

Tabla de contenido
loading

Tabla de contenido