Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
3
Making the water supply
connections
Use 1/2 in. I.P.S. faucet connections (1), or a
3/8 in. O.D. ball-nose riser (2) with supply line
coupling nuts (3) (not included).
Use a wrench to tighten the connections. Do not
over tighten or torque the copper supply line.

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator to flush the water lines. Do not lose the gasket in
the aerator.
Ensuring the handles are in the off position, turn
on the water supply and check for leaks. If you
discover any leaks, check your connections to
ensure they are installed properly.
Remove the aerator (B) and housing (if applicable).
Turn on the hot and cold handles to allow the
water to run for at least one minute. This flushes
away any debris that could cause damage to
internal parts.
Turn off the water and reinstall the aerator and
housing (if applicable).
1
5
2
3
HOMEDEPOT.COM/GLACIERBAY
1-855-HD-GLACIER

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Fs1a0046rbp302357340302357326

Tabla de contenido