peerless-AV ESA763PU Instalación Y Montaje página 15

Ocultar thumbs Ver también para ESA763PU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cable Management
NOTE: Make sure cables have enough slack to
J
8
allow full movement of the arm.
Run power cable through top or bottom of arm (A)
K
and signal cable(s) through other side of arm in
order to avoid interference with the signal. Lock
cables into place by snapping cable covers (J &
K) onto mount as shown. Display may have to be
moved for easy access.
Optional: If additional cable management is
required route cable ties (G) through slots of arm (A)
as shown in detail 3.
A
SLOT
G
CABLE
DETAIL 3
Snap wall plate covers (F) to top and bottom of wall
9
WALL PLATE RAIL
plate rails as shown.
F
15 of 50
ISSUED: 01-05-11 SHEET #: 061-9062-7 03-22-12

Publicidad

Tabla de contenido
loading

Tabla de contenido