Descargar Imprimir esta página

SPORTSTECH CX610 Manual De Usuario página 38

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Step 3
a. Lock the swing rod tube(31L/R) on each swing axes of the front post(30),and then
lock it tightly by the bolt(17), spring washer(8) and washer(19);
b. Lock the rear connector(58) on each crank axes of the main frame(48) by the
bolt(55L/R),wave washer(56),spring washer(59) and nylon nut(60L/R);
c. Lock the Left Swing rod cover (69L/R) and Right Swing rod cover (68L/R) on the
connecting rod(44) with screw(67).
d. Put on the ball caps(52)(61)(64).
-10-

Publicidad

loading