GYS NEOPULSE 220 C Manual Del Usuario página 39

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2T Pulse process:
T hotstart
Dstart
Soft-start
When the trigger is pulled, the Pre-gas starts. When the wire touches the part, a pulse initiates the arc. Then the machine starts with the HotStart,
Upslope and eventually the welding cycle starts. When the trigger is released, the Downslope starts to reach ICrater filler. Then the stop peak cuts the
wire followed by the Post gas. As in «Standard», the user has the possibility to quickly restart the welding during the Post gas without going through
the HotStart phase.
4T Pulse process :
T hotstart
Dstart
4T
Soft-start
En 4T pulse, la gâchette gère le Pré-gaz s'il n'y a pas de HotStart. Sinon elle permet de gérer la durée du HotStart, s'il est validé.v During the shu-
tdown, it allows to manage the Crater filler, if it is validated or the Post gas if there is no Crater filler.
NEOPULSE 220 C / 220 C XL
T upslope
T upslope
I
T downslope
I
T downslope
I blackout
Gas post-Flow
T burn-back
T crater Filler
I crater Filler
I Blackout
Gas post-Flow
T burn-back
4T
T crater Filler
I crater Filler
EN
39

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Neopulse 220 c xl

Tabla de contenido