Kohler FLEUR LITE Manual Del Usuario página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Install two new 5/16" diameter T-bolts into the closet flange.
TO INSTALL SUPPLY SHUT-OFF VALVE
Install the supply shut-off valve so it is 9" (22.9cm)above the
finished floor line, and 4-1/8" (10.5cm) to the left of the closet flange
centerline.
The centerline of the supply shut-off valve outlet should extend
3-5/8" (9.2cm) from the finished wall. Install the supply shut-off
valve with the outlet vertical.
TO INSTALL TOILET
Set the toilet upside down on some padding. Firmly press the toilet
gasket onto the toilet outlet.
NOTE:
If you are using a toilet gasket with an integral plastic
sleeve, make sure the gasket is positioned with the sleeve facing
away from the toilet.
If desired, place a 1/4" (6mm) thick bead of toilet setting compound
around the toilet base.
If you temporarily plugged the the closet flange with a rag, remove
the rag at this time.
Carefully align and lower the toilet over the closet flange and
T-bolts. Apply full body weight to the toilet rim to set the seal.
CAUTION:
Risk of external leakage: Do not lift or rock
the toilet after placement – a new toilet gasket must be
installed if you break the watertight seal.
Assemble the bolt cap bases, washers, and nuts on the exposed
T-bolts. Hand tighten the nuts, then tighten them an additional
1/2-turn.
CAUTION:
Risk of personal injury or product
damage: Overtightening may cause breakage or chipping
of the vitreous china.
If the T-bolts extend more than 1/4" (6mm) over the top of the nuts,
cut off the excess and file the end. Wipe away any residue. Install
the bolt caps.
Kohler Co., Kohler, WI U.S.A.
T-Bolts
9"
(22.9cm)
12"
(30.5cm)
Toilet Outlet
Toilet Gasket
Closet Flange
Bolt Cap
Nut
Washer
Bolt Cap Base
T-Bolt
3
Closet Flange
Fig. #3
Supply Shut-Off Valve
5"
(12.7cm)
Closet Flange
Centerline
Fig. #4
T-Bolt
Fig. #5
Fig. #6
A
1007287-2-

Publicidad

Tabla de contenido
loading

Tabla de contenido