9. Test the operation of the pump system by following the instructions in
this manual. Do not attempt to operate the pump without water; this will damage the seals and bear-
ings and could result in permanent damage to the pump.
10. Place cover over basin. This cover will help prevent debris from entering the pit and will guard against
accidental injury.
Typical Installation
I
GAS-TIGHT BASIN PER MINIMUM ON PAGE 3
3/16" (4.8 mm) AIR BLEED HOLE IN DISCHARGE PIPE
PLACE PUMP ON HARD, LEVEL SURFACE.
NEVER PLACE DIRECTLY ON CLAY,
EARTH, OR GRAVEL SURFACE
"Operation Testing" on page 7
SEPARATE PROTECTED AND GROUNDED SERVICE OUTLET, 4 ft FROM FLOOR
FLOAT SWITCH POWER CORD
PUMP POWER CORD
GATE VALVE
CHECK VALVE
DISCHARGE PIPE NO SMALLER
THAN PUMP OUTLET
2" OR 3" VENT PIPE
(51 OR 76 mm)
TETHER LENGTH:
3-1/2" (89 mm)
(See Page 3 for on/off levels)
BASIN COVER
INSTALLATION
Physical Installation
of
VERTICAL FLOAT
SWITCH
(See Page 3 for on/off levels)
5