13) Using the supplied zip
tie, secure the wiring in
place by sliding one end
of the tie through the
plastic anchor, looping it
around all of the power
wires, and then back into
the locking mechanism of
the tie.
14) The secured wires
should look as shown in
Figure 5.10. Trim off any
excess tie material using
diagonal cutters.
15) The completed
electrical installation of
the MODEL 1X is shown
in Figure 5.11. Replace
the back cover and
secure with the four
screws.
www.myheatworks.com
Figure 5.9
Figure 5.10
Figure 5.11
YOU ARE NOW READY TO PROCEED TO PLUMBING
INSTALLATION
Please continue to page 8
CAUTION: Breaker must remain off until installation is complete.