Cord Management - PEERLESS Paramount PP730 Instalación Y Montaje

Ocultar thumbs Ver también para Paramount PP730:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cord Management

Thread cable ties (G) through slots in the arm
3
assembly (AA) as shown in detail 1. Secure screen
cable to arm assembly (AA) by cinching the cable
ties (G) around the screen cable as shown in fig. 3.1.
NOTE: Leave enough cable slack so arm can fully
extend and tilt.
NOTE: Adjustment points (socket screws) are factory torqued for optimal performance. This factory torque setting is
recommended to prevent the screen from slipping over time. If more or less tension is desired follow this optional
step. You may not achieve optimal torque value if factory torque settings are adjusted.
If more or less tension is desired in the tilt mechanism, do the following:
• To adjust tilt, insert a flat head screw driver into slot and remove cap covering the socket screw. Tighten or loosen
socket screw no more than half a turn using 5 mm allen wrench (E) as shown in detail 2.
• To adjust roll, remove snap caps covering the 10-32 nylock nuts as shown in detail 2. Loosen 10-32 nylock nuts
half a turn and adjust roll position. Retighten 10-32 nylock nuts after screen is in desired roll position.
• Do not loosen socket screws or nylock nuts to the point they become disengaged from the mount. Doing so
may cause the screen to fall.
If more or less tension is desired in the arm pivot
points, do the following:
• To increase tension, turn socket screw clockwise with
3/16" allen wrench (I).
• To reduce tension, turn socket screw counter-clockwise
with allen wrench (I). Do not turn more than half a turn.
AA
SCREEN
fig. 3.1
OPTIONAL
WARNING
SOCKET
SCREW
SLOT
G
SCREEN
CABLES
DETAIL 2
SOCKET SCREWS
SLOTS
DETAIL 1
10-32 NYLOCK NUT
SNAP CAP

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Paramount pp730-s

Tabla de contenido