Kohler STERLING 2200A Serie Guia De Instalacion página 12

Puertas de ducha neo-angular
Ocultar thumbs Ver también para STERLING 2200A Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

13. Install the Flange Cushion and Final Caulking
Push a flange cushion into each of the two flange slots. Ensure each flange cushion snaps into place.
Carefully run a bead of caulk or silicone sealant around the outside of the door where the bottom
frame meets the top of the shower base ledge. Do not caulk on the inside of the shower door.
Pull the gasket up at each end of the bottom bridge member.
Carefully run a bead of caulk or silicone sealant at each end of the bottom bridge member.
Push the gasket down at each end of the bottom bridge member.
Allow the caulk or silicone sealant to cure for 24 hours before use.
1034045-2-C
Install
flange
cushion
here.
Caulk
Install flange
here.
cushion here.
Gasket
Flange
Cushion
Caulk here.
Flange
Flange
Slot
Caulk
here.
12
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido