Putting Into Operation - Cattini Oleopneumatica YAK 215/P Manual Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN

PUTTING INTO OPERATION

ASSEMBLY
1. Take the handle, the jack and the extensions out of the cardboard box.
2. The handle is divided into two parts. Prior to use, assemble as shown in the drawing using the dowel and spanner
supplied. DWG. 10
3. The handle fits inside one of the two seats, in the highest position to move it or in the lowest to position the jack under
the load.
CONNECTION TO THE COMPRESSED AIR SYSTEM
- Compressed air enters into the jack circuit through the quick coupling on the top of the manual lifting/descending controls;
it is therefore necessary to have a connecting pipe with a quick coupling compatible with that of the jack. Check that the air
supply pipe has a useful passage of at least 6 mm and it is not pinched or restricted anywhere. DWG. 11
WORKING AIR PRESSURE: 8 - 10 BAR
- Absolutely never put the following into the compressed air circuit: hydraulic or Vaseline oil, brake liquid, kerosene or other
liquids.
-Install a filter dehumidifier-lubricator unit in the compressed air system.
- If you want to lubricate the compressed air circuit use exclusively: 

AGIP OSO 100; MOBIL DTE 27; ESSO TERESSO 100;
SHELL TELLUS 100; BP ENERGOL HP 100
ACCESSORIES
The jack is supplied with two extensions or height adapters (120 mm the long extension, 70 mm the short extension), a
circular tooth plate (10 mm plate) and an extension holder.
Never use more than two extensions!
consequence of disregard for the above indications and the warranty conditions are invalidated thereof!
SCRAPPING AND DISPOSAL
- The lubricants must be disposed of in compliance with the anti-pollution laws in force.
- Scrapping the jack and its component parts must be carried out by the user in accordance with current laws.
The manufacturer is not liable for any damage resulting as a
13

Publicidad

Tabla de contenido
loading

Tabla de contenido