Safety Advice; Care & Maintenance; Tools & Equipment; General Advice - Palram Snap & Grow Manual De Usuario

Ocultar thumbs Ver también para Snap & Grow:
Tabla de contenido

Publicidad

EN
IMPORTANT
Please read these instructions carefully before you start to assemble
this greenhouse.
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
» Safety Advice
We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions.
Do not touch overhead power cables with the aluminum profiles. Always wear
shoes and safety goggles when working with extruded aluminum. Dispose of
all plastic bags safely - keep them out of reach of small children. The greenhouse
must be positioned and fixed on a flat level surface. Do not lean against or push
the greenhouse during construction. Keep children away from the assembly
area. Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs
or alcohol or if you are prone to dizzy spells. If using a step ladder or power
tools ensure that you follow the manufacturers safety advice. Hot items such as
recently used grills, blowtorches, should kept away from the greenhouse walls.
We recommend the greenhouse is bolted to a concrete base or slabs (fix hinges
are not supplied). However, if you want to fix directly in to the concrete ensure
there are no hidden pipes or cables in the ground before inserting the pegs.
» Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and
rinse with cold clean water. DO NOT use acetone, abrasive cleaners or other
special detergents to clean the clear panels.
» Tools & Equipment
• Tape measure
• Work gloves
• Plastic or rubber mallet
• Phillipshead screwdriver
• Step ladder
• Scissors
• Spirit level - For base alignment
• Cloth
» General Advice
This multi-part assembly is best achieved by two people. Allow at least half a day for the assembly
process.
Site selection instruction-choose a sunny level position away from overhanging trees. If you are fixing
your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base
supplied. The component parts should be checked and laid out close at hand. Keep all small parts
(screws etc.) in a bowl so they do not get lost.
• Sort the parts and check against the contents parts list.
• Carry out the assembly steps in the order set out in the instructions.
• The front of the greenhouse is the wall including the door, and the back is the opposite wall.
• After assembly fit the greenhouse to the base using connectors no. 924 and fit
the whole unit to a leveled final
• You may use Silicon lubricant spray in order to help you slide the profiles on the
connectors. Do not spray the Polycarbonate panels. Use the rubber malet if necessary.
» Notes (by steps)
Step 4: Profile 848 should be placed on the left
hand side to be connected to profile 849. Profile
848 is the one with the connector at the end.
Step 5: After connecting profiles 816 to each
other clean the connection area using a cloth.
Place the cover strip on the connection only when
it is clean and dry. Press the cover strip from one
side of the connection to the other as mentioned
in picture 4.
Step 8: Profile 835 & 836 should be aligned and
connected according to the illustration on page
8 a & b. plug 23 should be inserted to each
connection while the two dots on the front of
the plug should be in horizontal position for easy
assembly.
Step 10: Use part 95 as a template in order
to measure the gap between posts of the
greenhouse wall and roof area.
Step 11: Profile 841 should be placed on the right
hand side. Profile 840 should be placed on the left
hand side when viewed from the front.
Step 12: Slide the panel 566 till the end of the
rail and insert it into it's final position as shown in
illustration c .
Step 19: Be careful to assemble the window in
the position as shown on picture 20 a. profile 809
should be placed while the vent is closed to cover
any gap. Ensure profile 809 is fitted correctly as
shown on picture 20 b. The lip on 809 should face
toward the gutter.
Step 22: Slide the panel 566 till the end of the
rail and insert it into it's final position as shown
in illustartion a and b.
Step 23: Step inside the greenhouse and turn
all 23 plugs a 1/4 of a turn clockwise.
Step 24: Profiles 814 should be inserted from
the four corners of the greenhouse, then insert
profile 815 in between them.
Step 25: Ensure you use long screw 450
to secure the door catch 363 as shown in
illustration b.
Important Recommendations
• Firmly connect the greenhouse to a level
surface immediately after completion of
the assembly.
• Anchoring this product to the ground is
essential to its stability and rigidity.
It is required to complete this stage in
order for your warranty to be valid.
• Tighten all screws once assembly is
completed.

Publicidad

Tabla de contenido
loading

Tabla de contenido