Buhler P1.3 Manual De Funcionamiento E Instalacion página 48

Bombas de gas de medición
Ocultar thumbs Ver también para P1.3:
Tabla de contenido

Publicidad

6
This Certificate has been issued in accordance with FM Approvals US Certification Requirements.
15.
Schedule Drawings
1
7
A copy of the technical documentation has been kept by FM Approvals.
16.
Certificate History
1
8
Details of the supplements to this certificate are described below:
Date
11
th
April 2016
th
9
December 2016
nd
2
April 2020
THIS CERTIFICATE MAY ONLY BE REPRODUCED IN ITS ENTIRETY AND WITHOUT CHANGE
FM Approvals LLC. 1151 Boston-Providence Turnpike, Norwood, MA 02062 USA
T: +1 (1) 781 762 4300 F: +1 (1) 781 762 9375 E-mail:
F 347 (Mar 16)
SCHEDULE
US Certificate Of Conformity No: FM16US0414X
Description
Original Issue.
Supplement 1:
Report Reference: – RR207245 dated 9
Description of the Change: In the certificate, under Specific Conditions of Use,
Reformatting and changes to the Temperature Class Table for maximum gas
temperature and Temperature class values. Several drawings were updated for this
change. The Name Plate drawing was updated to correct the nonincendive
marking.
Supplement 2:
Report Reference: – PR455937 dated 2
Description of the Change: Add option for gas pump cover DC motors.
information@fmapprovals.com www.fmapprovals.com
th
December 2016.
nd
April 2020.
Page 3 of 3

Publicidad

Tabla de contenido
loading

Productos relacionados para Buhler P1.3

Tabla de contenido