Installation Of Outdoor Unit - Haier HSU-07HVA103/R2(DB) Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Indoor unit
Power cable:
HSU-07HVA103/R2(DB)
HSU-09HVA103/R2(DB)
HSU-12HVA103/R2(DB)
Indoor unit
2
4G0.75mm
2
Power cable:
3G1.5mm
HUM07HA03/R2(DB)
HSU-09HEA03/R2(DB)
HUM09HA03/R2(DB)
HSU-12HEA03/R2(DB)
HUM12HA03/R2(DB)
HSU-09HEA03/R2(DB)-I
HUM09HB03/R2(DB)
HSU-12HEA03/R2(DB)-I
HUM12HB03/R2(DB)
HUM09HC03/R2(DB)
HUM12HC03/R2(DB)
4G1.5mm
2
Indoor unit
Power cable:
3G1.5mm
HSU-09HA103/R2(DB)
HSU-12HA103/R2(DB)
4
HFU-09HA03/R2(DB)
HFU-12HA03/R2(DB)
Outdoor unit
Outdoor unit
POWER
Outdoor unit
2
1. If the supply cord is damaged, it must be replaced by the manufacturer or its
service agent or a similar qualified person. The type of connecting wire is
H05RN-F or H07RN-F.
2. If the fuse on PC board is broken please change it with the type of
T.3.15A/250VAC (Indoor), T.25A/250VAC (Outdoor).
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into fixed wiring. The breaker should be
all-pole switch and the distance between its two contacts should be not less
than 3mm.
Outdoor unit

Installation of Outdoor Unit

Drawing for the installation of indoor and outdoor units
Install according to
Connection of pipes
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
and the bending radius should be 30 to 40 mm or longer.
Connecting the pipe of gas side first makes working easier.
The connection pipe is specialized for R410A.
Forced fastening without careful centering may
Half union
Flare nut
damage the threads and cause a leakage of gas.
Liquid side6.35mm(1/4")
Liquid/Gas side9.52mm(3/8")
Gas side 12.7mm(1/2")
Gas side 15.88mm(5/8")
Spanner
Torque wrench
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 7m, the function of the unit will be
affected. If the pipe has to be lengthened, the refrigerant should be charged,
according to 20 g/m. But the charge of refrigerant must be conducted by profes-
sional air conditioner engineer. Before adding additional refrigerant, perform air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
charge additional refrigerant.
CAUTION
Indoor unit
B
A
Outdoor unit
Outdoor unit
Oil trap
B
Indoor unit
A
Connection
Use the same method on indoor unit. Loosen the screws on terminal block and
insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor
unit.
If wiring is not correct, proper operation can not be carried out and controller
may be damaged.
Fix the cable with a clamp.
Pipe Diameter( )
Fastening torque
Φ
18N.m
42 N.m
55N.m
60 N.m
Outdoor unit
B
Indoor unit
A
Max.Elevation: Amax=10m
In case the elevation A is more
than 5m, oil trap shoud be
installed every 5~7m
Max. Length: Bmax=15m
In case the pipe length B is
more than 7m, the refrigerant
should be charged, according
to 20 g/m.
3

Publicidad

Tabla de contenido
loading

Tabla de contenido