Reliable 7000 Serie Manual De Instrucciones página 17

Productos profesionales de vapor
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

AT END OF DAY:
RELEASING STEAM PRESSURE
To prolong the life of the boiler and its components, we recommend that this task be
performed at the end of the day.
1. Turn off the boiler switch.
Ni93;ii1i33M
FLUSHING THE BOILER OUT
To prevent limescale deposits, the boiler should be drained every week .
1. Should be completed in the
morning or when the boiler
is cold with zero pressure.
5. Open the drain
4. The safety cap
should be open. If it's
valve and allow the
water to be emptied
not, please remove
the cap completely.
into a large container.
8. The unit is now ready to be filled with water.
2. Press the steam button
on the iron handle until
the pressure drops to
zero.
. !f
2. Remove the plug
(using an 8mm alien key)
from the drain valve.
j{
6. When completely
emptied, close the
drain valve.
RELIABLE 7000 SERIES BOILERS
MAINTENANCE SCHEDULE
3. Open the filler safety
cap slightly to allow the
remaining steam to
release.
3. Attach the supplied clear drain hose to the
drain valve.
7. Remove the hose and reattach the plug at the
end of the drain valve.
4. To complete the
shutdown of the boiler,
turn the steam switch off.
Reliable Support & Service
1-800-268-1649
support@reliablecorporation.com
14

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

7000cj7000cd7500cd7500is7000is

Tabla de contenido