Liberty Pumps FL150-E Serie Manual Del Usuario página 8

Bombas para efluentes sumergibles
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
Upper Guide
Rail Support
Guide Rail Claw
Guide Rail Base
4.
Electrical Connection
4-1 WIRING OF PUMP
Liberty Pumps FL-Series Effluent pumps are
available in a wide range of voltage and phase
configurations. Prior to connecting the pump,
check the pump's nameplate to ensure it is
rated to match the supply voltage. See Fig. B,
Fig. C, and Fig. D for basic pump wiring
diagrams
for
configurations.
Additionally it is required that all pumps have a
means incorporated into the fixed system
wiring to disconnect all supply power.
4-2
CONTROL PANELS
Liberty Pumps FL-Series Effluent pumps must be controlled by an approved control panel in compliance with the
safety and control requirements of 2006/42/EC. Installation and connections are specific to the control panel.
Control panels should be installed and serviced only by a qualified electrician.
With Liberty Guide Rail
Fig. A – Typical Pump Installation
Electrical connection of the pump should comply
with all applicable electrical codes and shall be
performed by a qualified electrician.
all
1-Phase
and
3-Phase
To prevent serious damage to the pump, follow wiring diagram
included with control panel.
connect the pump until you have obtained diagram from control
panel manufacturer.
©Copyright 2014 Liberty Pumps Inc. All rights reserved
Without Guide Rail
(Shown using FL-Series Flange)
If diagram is missing, do not
8

Publicidad

Tabla de contenido
loading

Tabla de contenido