Section 3 Operation; Operation - Brooks Instrument Sho-Rate Serie Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49
Installation and Operation Manual
X-VA-1350G-eng
Part Number: 541B205AAG
September, 2017

3-1 Operation

Brooks
After the flowmeter has been installed in the flow system, it is ready for
operation. An optional built-in needle control valve may be provided to control
the flow through the flowmeter. These control valves are designed
for fine control. Excessive tightening may damage the valve seat and limit its
effectiveness as a control valve. If tight shut-off is required, it is
recommended that a separate shut-off valve should be installed in the line
immediately before the flowmeter.
Flow indication is measured using the center of the spherical float as the
reference point.
®
Sho-Rate
TM
Models 1350G/1355G

Section 3 Operation

3-1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sho-rate 1350gSho-rate 1355g

Tabla de contenido