Section 3 Operation; General; Operational Check; Operating Instructions - Brooks Instrument Full-View 1110 Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49
Installation and Operation Manual
X-VA-1110-1140-eng
Part Number: 541B040AAG
September, 2012

3-1 General

3-2 Operational Check

3-3 Operating Instructions

After the flowmeter has been properly installed in the process, it is ready
for operation. When initiating flow, slowly open the valve to avoid a flow
surge.Bypass is a help in bringing the flow on smoothly. Avoid starting a
pump to supply the flowmeter without the use of a valve upstream of the
flowmeter.
Prior to initial start-up and each time the flowmeter is reassembled, the
zero alignment should be checked. If the zero line on the tube is aligned
with the zero line on the scale, the flowmeter is ready for operation. If the
zero lines are not aligned, loosen the screws securing the scale and move
it until the marks are in alignment. Then tighten the screws.
Plastic protective sleeve must remain over glass
tube. (Meter sizes 7 -13 only)
Fasten meter windows securely.
Do not operate above pressure and temperature
limits.
Avoid pressure and flow surges.
Do not service or repair while pressurized.
Read and understand instruction manual.
Failure to comply could result in serious personal
injury or property damage.

Section 3 Operation

®
Brooks
1110 and 1140 Series
WARNING
GLASS TUBE
EXPLOSION
HAZARD
3-1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Full-view 1140

Tabla de contenido