Section 3 Operation; Pre-Start Check; Start-Up And Operation Of Flowmeter - Brooks Instrument MT36 Serie Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
Installation and Operation Manual
X-VA-MT3600-eng
Part Number: 541B075AAG
March, 2016

3-1 Pre-Start Check

3-2 Start-up and Operation of Flowmeter

After the flowmeter has been properly installed in the process, it is ready
for operation. When initiating flow, slowly open the valve to avoid a flow
surge. Bypass is a help in bringing the flow on smoothly. Avoid starting a
pump to supply the flowmeter without the use of a valve upstream of the
flowmeter.
At no flow condition the indicator pointer should align with the "R" mark on
the scale. If necessary, adjust the pointer as per directions in the
Maintenance Section 4.
a. Slowly initiate flow into the system. Open process valves slowly to avoid
flow surges.
b. Check for leaks around the meter inlet and outlet connections. If no
leaks are present, bring the system up to operating pressure.

Section 3 Operation

MT36xx Series
3-1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mt3602Mt3601

Tabla de contenido