NSPECTION
EFORE
According to national and international accident prevention and safety regulations load lifting
attachmentt must be inspected:
• in accordance with the risk assessment of the operating company,
• prior to initial operation,
• before the unit is put into service again following a shut down
• after substantial changes,
• however, at least once per year, by a competent person.
Attention: Actual operating conditions (e.g. operation in galvanizing facilities) can
dictate shorter inspection intervals.
Repair work may only be carried out by specialist workshops that use original TIGRIP spare
parts. The inspection (mainly consisting of a visual inspection and a function check) must
determine that all safety devices are complete and fully operational and cover the condition of
the unit, suspension, equipment and supporting structure with regard to damage, wear,
corrosion or any other alterations.
Initial operation and recurring inspections must be documented (e.g. in the CMCO works
certificate of compliance).
If required, the results of inspections and appropriate repairs must be verified.
Paint damage should be touched up in order to avoid corrosion. All joints and sliding surfaces
should be slightly lubricated. In the case of heavy contamination, the unit must be cleaned.
I
B
NSPECTIONS
Check the complete load lifting attachment for damage, cracks or deformations.
The load lifting attachment must open and close easily and freely.
Load lifting attachment with protective lining (optional)
The surface of the protective lining must be free of grease and oil.
The protective lining must be replaced when the thickness is less than 2,5 mm.
Models with protective lining may be used at temperatures between -20 °C and +60 °C.
Checking the chain sling
Chain slings must be inspected at regular intervals in accordance with DIN 685-5. They must
in particular be replaced in the event of wear exceeding 10% of the nominal thickness of the
chain links.
Chain slings must be checked for outer defects, deformations, cracks, wear and pitting.
An elongated or worn chain must be replaced.
I
O
NITIAL
PERATION
S
EFORE
TARTING
©
2016 Columbus McKinnon Industrial Products GmbH
W
ORK
16

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tigrip twh 50Tigrip twh 70Tigrip twh 100

Tabla de contenido