GE UVW9304 Manual Del Propietario Y Instalación página 16

Ocultar thumbs Ver también para UVW9304:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NEW CONSTRUCTION, PRE-PLANNING, OR REMODELING
NOTE: For existing instruction, skip to the next section.
FOR TOP VENTING
For ducted installation through the top, the 8"
diameter hole (for 30" or 36" model) or the 10"
diameter hole (for 48" model) for the duct in the
ceiling must be center 6-1/4" away from the finished
rear wall in the installation space.
16
Installation Preparation
left from center of the hood. Ensure enough wire length is
available to make electrical connection.
6-1/4"
FOR BACK VENTING
10-1/2"H x 13-1/4"W cut out for the duct in the wall
must be centered in the installation space, left to
right and located 3-3/4" above intended install height
from bottom of the hood.
3-3/4"
10-1/2"H x 13-1/4"W
Bottom of Hood
49-2000707 Rev. 4

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Uvw9364Uvw9484

Tabla de contenido