B e t a M a x P o r t a b l e H o i s t s O p e r a t i n g a n d M a i n t e n a n c e P r o c e d u r e s M a n u a l
O p e r a t i o n a n d S e t u p
10. Remove the temporary capscrews (E) from braces (D).
11. Connect two braces (D) on one side to the center tab of the Scaff-Trac
Monorail (B) using cap screws (E).
12. Hand-tighten the nuts.
13. Repeat Steps 11 - 12 for the other side.
14. Measure the distance between both uprights in two places (left and right sides)
to ensure the unit is square. If the measurements are the same (left and right),
the unit is square and no more attention is needed. If the measurements are not
the same, nudge or move the unit, remeasure and continue until the unit is
square.
15. Once the unit is square, tighten all capscrews and nuts.
16. Attach the correct counterbalancing. (See Counterbalancing Calculations for
details)
5-26
www.betamaxhoist.com
1-800-233-5112