Assembly And Start-Up - BEKAWORLD BEKAONE120 Manual De Montaje E Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Please remember to adjust and ventilate the BEKAONE120 prior to assembling it.
Prior to assembly, prefill the lubrication point and lubrication lines or extensions with the
appropriate lubricant. You can use e.g. the hand-lever grease gun for that.
1. Clean the lubrication
point
4. Screw in the BEKAONE120 hand-tight,
use an adapter, if necessary
Assembly and start-up of the BEKAONE120 may be done only by qualified technical personnel
with the necessary knowledge.
Take all necessary measures for assembling a complete machine from the BEKAONE120
and other components in a proper and eco-friendly way, without impairment of persons'
health and safety.
2. Remove the old
fitting

09 - Assembly and start-up

3. Prefill the lubrication point and possibly
lubrication lines with lubricant
5. Tighten the connection thread
at the hexagonal bolt
EN
-28-

Publicidad

Tabla de contenido
loading

Tabla de contenido