Fulgor Milano SOFIA PRO-RANGE F6PGR366S2 Instrucciones Para La Instalación página 14

30-36
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4 - Installation Instructions
EN
STEP 7
In case it is necessary to move the range; using the foam and/
or cardboard packaging (13), replace them around the range
strategically to protect the finished surfaces of the range from
contact with the hand-truck and any straps around the unit
(14). In the case of smaller ranges, you may use this technique
to remove the range from the skid and installing the legs (15).
Tilt the range to lower the hand-truck wheels off the skid. Place
appliance runners on the floor at the left and right sides in
front of the opening when moving into final position to protect
flooring. The oven door(s) add(s) a great deal to the overall
weight of the range, you may find it helpful to remove the
doors if moving the range a significant distance. Refer to the
included instruction manuals for how to remove and reinstall
the doors.
13
14
10
STEP 8
Some models come from the factory with the cast iron island
style trim pre-installed. If not pre-installed, follow the installation
instructions included with the island trim which also includes a
screw and bracket kit. The image below shows the installation
of the optional stainless steel accessory back guard / trims
available in island style, 3" height and 9" height for purchase
separately as accessories.
STEP 9
After completing the electrical and gas connections (see
included instructions) measure the four corners in cutout area
to verify if flooring is level. Adjust the leveling legs to the desired
height and ensure range is level. Turn the bottom section of
each leg counter-clockwise to raise the leg and clockwise to
lower it.
Ensure floor is protected. Slide unit into place making sure to
engage the anti-tip bracket.
15
9"
3"

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sofia pro-range f6pgr304s2

Tabla de contenido